Metal Roofing Installment of Main Stadium speeding up

2014-05-23 10:25   
The construction of Main Stadium has currently stepped into the metal roofing installment period. As assumed, this installing will be finally accompli..

 

 

 
The construction of Main Stadium has currently stepped into the metal roofing installment period. As assumed, this installing will be finally accomplished by the end of this year.
It is said that aluminum magnesium manganese plates with less weight and 1.5 millimeter thick will be installed to Main Stadium as a ‘light metal coat’. Besides this special material, another polycarbonate panel will be carefully selected to roofing. As this sort of panel performs excellently on light transmission, and will result in better light clarity in arenas.